December 27, 2024
tami sin youtube  twitter facebook

    Navy clears woody debris collected under Dodangoda, Agaliya and Wakwella bridges

    October 30, 2022

     The Navy was pressed into action to clear woody debris clogged under Dodangoda, Agaliya and Wakwella bridges over the Gin Ganga in Baddegama area, from 25th to 28th October 2022.

    Due to heavy rains, the water level in the Gin Ganga rises, so debris and tree remains get trapped under these bridges hampering the downstream of river water. Responding to this eventuality Sri Lanka Navy often engage in clearing these woody debris collected under the bridges, to avert possible flood risk in respective areas.

    Accordingly, the Navy sent out a team of Navy divers and Rapid Action Boat Squadron personnel attached to the Southern Naval Command to clear the blockages underside of above bridges and restored the free flow of water. The teams of naval personnel worked in coordination with personnel of the Irrigation Department and averted a possible flood threat in low-lying areas.


    SL Navy

    long bannar

    Latest News

    dgi log front

    recu

    electionR2

    Desathiya